Stage 14 The Boulevard
Mawsons have built each stage of The Boulevard and this John Deere is grading topsoil for Stage 14 of the subdivision.
We have constructed every stage of the development building the roads, roundabout, kerb and guttering and all the unseen infrastructure like the drainage, power, telecom, water and of course the sewerage reticulation services including the pump station.
Mawsons have even constructed a pedestrian bridge over the overland floodway for the shared path that connects the development to the surrounding area.
We have constructed every stage of the development building the roads, roundabout, kerb and guttering and all the unseen infrastructure like the drainage, power, telecom, water and of course the sewerage reticulation services including the pump station.
Mawsons have even constructed a pedestrian bridge over the overland floodway for the shared path that connects the development to the surrounding area.